Bathroom & Kitchen Renovation

The two rooms that pay you back — done in the right order, by one crew.

Text is the fastest way to reach us.

Or request a free estimate online →

What the work involves

Bath & Kitchen, explained

Bathrooms and kitchens are the highest-value rooms in a home and the least forgiving to renovate. They stack plumbing, electrical, waterproofing, tile, cabinetry and finish carpentry into a small footprint where every mistake is visible and expensive to undo.

We handle full gut renovations and targeted updates — a new vanity and tile floor, a tub-to-shower conversion, cabinet and countertop replacement, new backsplash and lighting. Licensed plumbing and electrical work is coordinated with trusted trade partners and inspected before anything gets closed up.

What's included

  • Demolition, debris removal and floor protection along the work path
  • Framing changes, blocking for grab bars, vanities and wall-hung fixtures
  • Coordination of licensed plumbing and electrical rough-in
  • Waterproofing and cement board in wet areas before tile
  • Floor, wall and shower tile with proper slope, niches and curbs
  • Vanity, cabinet, countertop and hardware installation
  • Fixture, faucet, toilet, sink, exhaust fan and lighting installation
  • Paint, trim, caulking and final detail work

No cost, no obligation

Want a written price for your bath & kitchen project?

We walk the space, measure, and hand you an itemized scope — so you can compare like for like instead of guessing.

Text is the fastest way to reach us.

Or request an estimate online →

How the job runs

  1. 1

    Scope & selections

    We walk the space, discuss layout options, and build a written scope. You choose tile, vanity, fixtures and countertops early — waiting on a back-ordered vanity is the number one cause of stalled bathrooms.

  2. 2

    Demo & rough-in

    The room is stripped, plumbing and electrical are moved or updated, and framing is corrected. This is when hidden rot, old galvanized pipe or bad wiring shows up — we document it and price it before proceeding.

  3. 3

    Waterproofing & board

    Wet walls get cement board and a waterproof membrane. Shower pans get sloped and flood-tested. Nothing gets tiled over unprotected drywall.

  4. 4

    Tile & cabinetry

    Tile is laid out so cuts fall symmetrically, then cabinets, vanities and countertops are set level and scribed to the walls.

  5. 5

    Fixtures & finish

    Faucets, toilets, lighting, mirrors, hardware and trim go in, everything is caulked, and the room is cleaned and walked with you.

What to expect as a homeowner

  • A standard full bathroom gut typically runs 2–3 weeks; kitchens usually run 3–6 weeks depending on cabinet lead times.
  • Plan for one bathroom to be out of service — if it is your only one, we will phase the work to keep a toilet usable as long as possible.
  • Material lead times drive the schedule more than labor does. Ordering early keeps the crew moving.
  • Multi-family and co-op buildings may require permits, building approval and a certificate of insurance; we tell you which apply before work starts.

Bath & Kitchen questions we get asked

Let's get your bath & kitchen project scheduled

Ainsworth Smith will walk the job, answer your questions honestly and give you a written estimate — usually within a business day of your call.